Production Management System (PMS)

paper

Inputs required by the system are:

Shift wise production
Downtime period and downtime remarks
Chemicals & Dyes consumption
Raw-Material consumption
Fuel consumption
Man-Power and refiner details
Finished production and wastage under each type.
Production – Scanner, Machine, Finished, Equipment and Steam

Systems Features are :

Captures data from pulp section to packing of finished goods
Analysis of downtime
Performance report of shift supervisors
Efficiency of production
Automatic finishing loss calculations
Reports for any given period
Comparison with standards

 

back